Final Acceptance of the New Waste Removal System for Stamping Waste at Protact GmbH

Steinfeld, May 2014

In May 2014, the commissioning of the waste removal system has been finished successfully.

The waste removal system of two lines includes six suction points in total. The waste removal system allows the continuous suction and conveying of stamping waste from PP and PE foil. The waste is collected directly at the stamps and transported via the conveying fan to the BIG BAG stations.

Go back